Relevance of BS 5268-2 Load-bearing
Guidelines on Concrete Formwork
- Another important area on a construction site is the
provision of falsework ie concrete formwork, staging or other support
systems. These have to carry loads, but for a temporary period only.
However,
with the increase in scale, frequency and complexity of falsework
application, the need for authoritative guidance has grown accordingly.
- This
has led to the publication of BS 5975: 1996 – Code
of practice of falsework. The new edition of this code brings it
into line with BS 5268 Part 2.
- For the design, erection and use of concrete
formwork, the publication issued by the Concrete Society ‘Formwork – A
guide to good practice’ is the bible.